Muingnaminnane
was connected to the grid in July 2008, with a maximum capacity
of 15.3 MW. Eighteen Enercon turbines (E-44 and E-48 turbine models)
have been erected and commissioned. Saorgus Energy operates the
wind farm, to ensure the maximum possible output is being delivered
to the grid.